Automated Milk Wet Products Plant

Tetra Pak NZ Ltd | Synlait, Dunsandel, South Canterbury, New Zealand

EIS were contracted to install electrical equipment and help with commissioning on a green field site with two new automated filling lines

EIS installed cable ladder, power supply cabling as well as instrumentation cabling, VSDs, new MCCs, connection of safety circuits and communication networks.  EIS worked alongside Serac and Sidel to install their OEM automated filling lines to meet NZ standards.

This green field project was completed with 19,500 hours over a period of six months on site working with Tetra Pak NZ Ltd to meet and exceed project deliverables.

Contract value: $2.5m

 
Synlait pic.jpg
 
The EIS team have worked extremely well for the completion of Project White successfully on time and exceeded the quality expectation of the Dunsandel site team for Synlait Milk Ltd. The EIS team is very experienced, passionate and committed to Tetra Pak to meet our project needs. EIS have a terrific workforce to get the job done in the best interest of their client.
— Himanshu Patel, Tetra Pak NZ Ltd, Project Engineer