Transportable Power Distribution Centre / MCC

Oceana Gold Corporation | Macraes Gold Mine, Otago, New Zealand

EIS were engaged to develop a new power distribution centre to provide the power source and house the motor controllers for the mine.

EIS designed and developed a portable power distribution centre and switchroom which was assembled and fitted out in Invercargill before being transported to the mine. Based on a high-level brief of Oceana Gold’s operating requirements for a transportable skid-mounted power distribution centre, EIS designed structural engineering and electrical plans for the unit which after client review was fabricated and fitted out.

Contract Value: $300k

 
 
We are really pleased with the portable power distribution centre EIS have designed for our Macraes site. It is the perfect solution for our industry and we are now looking at the possibility of introducing similar ones into some of our other locations
— Ian Harrington, Electrical Technical Supervisor, Oceana Gold
Previous
Previous

Carbon Bake Furnace Multipurpose Machines

Next
Next

Shotover Waste Water Treatment Plant